| 1 | PET Striping Band (Cons. & Programming) | Bekasi | 2010 |
| 2 | Chevron-Gas Plant Integration
Monitoring Systems (Cons. &
Programming) | Riau | 2010 |
| 3 | Chevron-Dehydration Unit (Cons. &
Programming) | Riau | 2010 |
| 4 | KalTim Pacific Amoniac-Upgrade
FlowCom at SKG (Cons. & Programming) | Kalimantan Timur | 2011 |
| 5 | EMP Malacca Straits-Gas Metering of DC
KUAT (Cons. & Config.) | Kepri | 2013 |
| 6 | AES-Sampoerna Net dari Guascor Engine
ke Omron PLC Biogas Process (Cons. &
Programming) | Palembang | 2016 |
| 7 | Bekaert Power Saving AHU dengan PLC
Omron (Cons. & Programming) | Karawang | 2017 |
| 8 | KDM Metering systems S600 flocom with
orifice plate | Bontang | 2018 |
| 9 | Vopak BCU Configuration (Cons. &
Config.) | Merak | 2019 |
| 10 | Assembly of LVMDP Project Panel and
Power Monitoring Systems (PMS) at BDX
Data Centre Jatiluhur | Purwakarta | 2022 |
| 11 | Yasunaga-Preventive Maintenance for
Panel Cubicle, MV, LV & SDP | Cikande | 2023 |
| 12 | Yasunaga-Installation of Grounding Rod | Cikande | 2023 |
| 13 | Victory Chingluh Indonesia-Termination
of Transformer and Cubicle | Tangerang | 2023 |
| 14 | Summarecon Mall Bandung-Pulling
Control BAS FAN | Bandung | 2023 |
| 15 | Summarecon Mall Bandung-Control
Panel Termination | Bandung | 2023 |
| 16 | Summarecon Mall Bandung-Installation
of Ladder | Bandung | 2023 |
| 17 | Integration SCADA from BCU (Batch
Control Unit) at TBBM Pertamina
SANGGARAN | Sanggaran - Bali | 2023 |
| 18 | Pulling Medium Voltage (MV) Cables | Cikarang | 2023 |
| 19 | Pertamina Plaju RU III- Upgrading
VMS (Vibration Monitoring System) | Palembang | 2023 |
| 20 | Instalation UPS and Battery AT CGK4 | Gambir | 2024 |
| 21 | Installation VMS (Vibration Monitoring
Systems) at IP Plabuhan Ratu | Gambir | 2024 |
| 22 | Installation PMS Controller Accessories | Kota Semarang | 2024 |
| 23 | Project reethau / GT Ladang | Kutai - Kalimantan | 2024 |